Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich consequence resulted from errors during quipu data interpretation for ancient Inca bridge maintenance scheduling?
A)Decreased suspension cable load limits
B)Increased masonry wear rate
C)Unplanned bridge deck subsidence✓
D)Localized terracing landslides worsen
💡 Explanation
Unplanned bridge deck subsidence results from faulty data transmission because the *numerical recording errors* misrepresent maintenance schedules. Accurate knot values maintained structural integrity; therefore, bridge collapses occur rather than proper resource allocation or other incremental effects.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which outcome occurs in Mughal pietra dura inlay when excessive soluble salt crystallization occurs within a humid environment?
- Which effect reduces hydrostatic stress in Inca masonry?
- Which risk increases when a caravel's hull exceeds design limits?
- Which outcome concerning Roman road systems increases when drainage channels are persistently blocked?
- Which outcome occurred if the Chinese manufactured early gunpowder with potassium nitrate rather than sodium nitrate?
- Which outcome resulted from exceeding the compressive strength limit in Roman concrete arch construction?
