Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich increased consequence faced early rope bridge builders?
A)Catastrophic tensile rupture acceleration
B)Severe cyclical material fatigue✓
C)Unpredictable node corrosion increase
D)Compromised cable insulation rating
💡 Explanation
Cyclical material fatigue increases a previously unknown risk because repeated stress weakens fibers over time; this leads rope strands to snap under normal load rather than due to a single over-stress event, therefore, B is correct. Options like insulation or corrosion do not apply to rope bridges.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which constraint necessitates precise rope angles within Inca suspension bridges?
- Which consequence results when atmospheric refraction corrupts sextant readings during celestial navigation?
- Which early challenge confronted metallurgists making gunpowder-propelled rockets?
- Which outcome occurs when the retaining wall of an Inca agricultural terrace experiences hydrostatic overload?
- Which issue resulted when early chinampa agriculture over-extended canals?
- Which primary structural challenge did Mesopotamian engineers face during ziggurat construction regarding soil liquefaction?
