Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich maintenance activity reverses spalling during restoration of Mughal pietra dura?
A)Applying epoxy consolidating agent✓
B)Applying sacrificial protective coating
C)Pressure washing surface contaminants
D)Substituting softer stone matrices
💡 Explanation
Spalling of pietra dura occurs because water penetrates micro-cracks, weakening the adhesive. Applying epoxy consolidates the decaying stone via capillary action, therefore stopping further dislodgement, rather than surface protectants which only delay ingress.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which mechanism limits projectile velocity in early Chinese gunpowder-propelled bamboo rockets?
- Which risk was historically increased when manufacturing repeating crossbows using insufficiently tempered bronze?
- Which outcome resulted from the intentional addition of arsenic to copper during the Early Bronze Age?
- Which risk increases when Roman concrete fortifications were built with high amounts of seawater during construction?
- Which outcome limited early hand cannon effectiveness relative to improved Chinese crossbows?
- Which positional error increased for mariners without accurate chronometers because of accumulated inaccuracies?
