Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich outcome arose in Inca administration when a specific quipu failed to convey required labour metrics?
A)Temple construction timeline was delayed
B)Royal message was lost
C)Terrace maintenance was incorrectly planned✓
D)Crop rotation schedule was unrecorded
💡 Explanation
Terrace maintenance suffered when quipu containing labour metrics were misread because inaccurate maintenance scheduling led to localized failures rather than grand logistical failures. The decimal record-keeping process 'mnemonic accounting' process ensured localized, immediate, direct impact; therefore maintenance rather administrative changes were the key constraint.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which consequence increased the risk of deploying Roman torsion siege weapons during prolonged sieges in humid coastal environments?
- Which crucial outcome resulted from the early Chinese mastery of the investment casting process, when producing complex bronze crossbow trigger mechanisms?
- Which limiting outcome increased structural risk when tensioned-rope bridges were first introduced alongside stone arches?
- Which outcome results from depleted hydraulic head at Aztec chinampa systems?
- Which outcome occurs when a trebuchet's counterweight is released from an elevated position?
- Within Mughal inlayed structures, which consequence accelerates deterioration following seasonal temperature cycles?
