Which outcome of compromised concrete pour timing during post-tensioning?

A)Bond failure reduced stress transfer
B)Increased ductility under tensile load
C)Creep reduced overall beam deflection
D)Enhanced concrete fracture toughness properties

💡 Explanation

Delays impair consolidation, therefore reducing the mechanical interlock via adhesive bonding because voids form preventing uniform stress distribution via force transfer, rather than ductility gains that proper procedure provides.