← HistoryWhich risk dramatically increased when early Roman road construction exceeded its design limits on highly sloped terrain?
A)Aqueduct collapse from unstable soil
B)Landslide-induced roadbed displacement✓
C)Bridge failure from increased span lengths
D)Tunnel implosion from overburden pressure
💡 Explanation
When Roman roads exceeded slope design limits, soil shear failure occurs because gravity overcomes the soil's internal friction, leading to landslides that displace sections of the roadbed. Therefore roadbed displacement results, rather aqueduct collapse, bridge failure, or tunnel implosion which are affected by distinct structural mechanisms.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which mechanism enabled Roman aqueducts to maintain a consistent water flow across valleys despite elevation changes?
- Which benefit did Mesoamerican chinampa agriculture provide specifically for sustainable maize cultivation?
- Which risk increases when copper used in Early Bronze Age axe heads incorporates high arsenic concentrations?
- Which mechanism caused increased hogging stress during construction of 18th century wooden warships?
- Which structural consequence arises when timber pile foundations remain intermittently exposed to air and water?
- Which vulnerability increased susceptibility of the 18th-century wooden warships to capsize during heavy broadsides?