Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk increases when improperly calibrated tensioning equipment stresses a pre-stressed concrete beam beyond designed limits?
A)Sudden brittle tendon rupture✓
B)Increased long-term creep deformation
C)Accelerated corrosion within the concrete
D)Reduced shear capacity at beam ends
💡 Explanation
When excessive tension stresses a beam beyond its yield point, brittle failure of the prestressing tendons can occur because the steel's strain hardening capacity is exceeded without sufficient warning. Therefore, tendon rupture results, rather than gradual creep, accelerated corrosion, or reduced shear, which involve distinct degradation mechanisms.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which risk increases when electrical transmission systems experience harmonic distortion?
- Which risk increases when hydroelectric turbine operates at a cavitation inception number lower than its design value?
- Which consequence results when high-speed optical transmissions exceed fiber's Polarization Mode Dispersion Compensation?
- Which buckling effect arises when a steel I-beam undergoes unequal flange loading during elevated temperatures?
- Which failure risk during concrete bridge construction increases as rebar spacing declines?
- Which fracture pattern arises when concrete columns experience shear overload?
