← TechnologyWhich risk significantly increases during the post-tensioning process of a concrete bridge deck when grout density is insufficient?
A)Cable corrosion due to moisture ingress✓
B)Concrete cracking from uneven stress
C)Reduced deck stiffness under load
D)Increased creep deformation over time
💡 Explanation
When grout density is insufficient, incomplete filling of the duct occurs, increasing the risk of cable corrosion because it allows moisture ingress, leading to oxidation of the steel strands. Therefore, cable corrosion results, rather than cracking, reduced stiffness or increased creep, requiring alternative mechanisms related to concrete matrix and overall structure.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which outcome occurs when a grinding wheel's rotational speed excessively increases during CNC machining?
- Which outcome occurs when excessive cylinder head pressure increases force applied to an internal combustion engine's piston crown?
- Which risk increases for a diesel engine using pilot injection in cold temperatures?
- Which flight characteristic degrades when washout is insufficient in aircraft design?
- Which kinematic calculation reduces servo jitters in hexapod locomotion, due to surface irregularities?
- Which risk increases in a distribution transformer when subjected to highly reactive inductive loads?