Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich outcome occurs when a PLC's scan cycle exceeds its specified watchdog timer duration in an automated bottling plant?
A)System transitions to a fault state✓
B)Increased bottle filling liquid density
C)Robot arm speed independently increases
D)Conveyor synchronization becomes optimized
💡 Explanation
The system faults due to watchdog timer expiration triggering error-handling; because the allotted time is over, the internal protective fault state is active rather than proceeding. This prevents erratic and possibly dangerous operational modes from continuing normally; therefore, the whole system locks up to prevent injury.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which risk increases when a residential heat pump's defrost cycle malfunctions?
- Within a hydraulic robotic arm, which consequence results when the actuator control valve's poppet sticks?
- Which outcome occurs when variable-frequency drive (VFD) control fails on a centrifugal pump maintaining constant chilled-water-supply temperature in a large HVAC system?
- Which risk increases when rebar cages in reinforced concrete columns experience insufficient concrete cover?
- Which risk increases when steel-reinforced concrete support columns experience prolonged chloride ion penetration?
- Which performance issue results when hydraulic actuators experience thermal expansion?
