Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk increases when watchdog timers fail in PLCs controlling automated crane systems?
A)Uncontrolled load swing develops✓
B)Reduced data-logging resolution occurs
C)Communication bandwidth becomes saturated
D)Encoder synchronization lags severely
💡 Explanation
An uncontrolled load swing develops because, without the watchdog timer, the PLC might freeze due to electrical noise. The crane's controlled movements cease, and the unbraked load oscillates violently under gravity's influence; therefore the answer is uncontrolled load swing, rather than safe halting, under faulty conditions.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which outcome results when a lathe toolchatters during a cut on a slender metal shaft?
- Which risk increases when electronic heat sink fan RPM degrades due to dust accumulation?
- Which outcome occurs when inadequate fin spacing reduces airflow across the condenser coils in a refrigerator's refrigeration cycle?
- Which outcome occurs when a transformer operating near saturation experiences a large DC current?
- Which outcome occurs when a forging press experiences hydraulic fluid contamination?
- Which risk increases when rapidly switching capacitor banks in a power distribution circuit happens?
